Driven electrician with nearly 2 years of progressive commercial and industrial experience. Proven ability to run smaller projects independently and serve as a second lead on large-scale job sites. Strong background in conduit installation, system layout, and job site coordination. Recognized for reliability, leadership potential, and maintaining high-quality workmanship.
Installed MC cable and completed terminations into electrical panels for various systems. Ran Cat6 cabling and terminated RJ45 connections for data infrastructure. Performed high-elevation power drops from approximately 50-foot warehouse ceilings and gained extensive experience operating scissor lifts to complete overhead work safely and efficiently.
Served as Second Lead on large-scale residential/commercial development. Assisted in coordinating workflow and ensuring project progression.
Acted as Second Lead on site, supporting crew operations and overseeing installation progress. Installed over 5,000 feet of EMT within a short project timeframe, demonstrating efficiency and high productivity.
Managed crews and daily work activities, ensured materials were ordered and available on site as needed, and coordinated with plumbers and other trades to prevent conflicts and maintain project efficiency. Installed underground 4” PVC conduit systems for power distribution across site infrastructure.
Took a leadership role in executing electrical work while ensuring project deadlines were consistently met. Pulled and installed wiring systems, set and installed EV chargers, and completed terminations at both panels and charging units. Led the replacement of all exit signs and emergency battery units (EBUs) throughout the facility, maintaining code compliance and system reliability.
Performed demolition of existing lighting systems in the front office and installed new lighting fixtures per customer specifications. Ensured clean removal, proper installation, and compliance with project requirements.
Began on project as an apprentice assisting with rough-in installation, then advanced to a lead role to complete trim-out. Demonstrated ability to take ownership of project completion and ensure quality workmanship.
Installed 3/4” EMT for lighting circuits and performed testing on exit signs and emergency battery units (EBUs) to verify proper operation and code compliance.